---
title: "SPP 418: Using the Scheduler for Starts"
description: "**Section:** Service Procedures **Subject:** Using the Scheduler for Starts **Approved by:** Tony Massey **Effective Date:** 29 January 2001 **Last Reviewed Date:** 14 October 2025 **Policy Owner:** Director of Administrative Training # Policy ## Purpose This procedure outlines the process for scheduling starts using the ServicePro Scheduler.…"
url: "https://milo.masseyservices.com/docs/spp-418-using-the-scheduler-for-stats/"
updated: "2026-03-17"
category: "SPP 400: Pest Prevention & Lawn Service Procedures"
---

# SPP 418: Using the Scheduler for Starts

**Section:** Service Procedures

**Subject:** Using the Scheduler for Starts

**Approved by:** Tony Massey

**Effective Date:** 29 January 2001

**Last Reviewed Date:** 14 October 2025

**Policy Owner:** Director of Administrative Training

# Policy

## Purpose

This procedure outlines the process for scheduling starts using the ServicePro Scheduler. This tool allows for visibility from any service center or Customer Care, ensuring a consistent and accurate scheduling process.

**Part 1: Building the Calendar**

- First, get the customer's address from the Sales Inspector. This will determine the route.
- In Scheduler, select Build.
- Choose the correct Branch (Service Center).
- Select “Click here to search” to view the Route menu, select the route, and click OK.
- Next, choose either the Date Range or Calendar option. For example, under Date Range, you may select options such as "Today & Next 2 Days" or "This Week," while the Calendar allows you to select a specific date or date range.
- Click Build New.

![](https://milo.masseyservices.com/wp-content/uploads/2025/11/SPP-418-Image-1-2-1.png)
Figures 1 & 2: Building the Calendar

**Part 2: Scheduling and Creating a Block Time**

1. Work with the Sales Inspector to find the best day and time for the appointment.
2. To open the Block Time window, you have two options:
   1. Option A: Click directly on an open time slot on the calendar. A pop-up window will appear. (Figure 3)
   2. Option B: Click Block Time at the top of the screen. The Block Time fields will appear on the left side, like the Build screen. (Figure 4)

![](https://milo.masseyservices.com/wp-content/uploads/2025/11/SPP-418-Image-3.png)
Figure 3. Creating a Block Time directly from the calendar.

![](https://milo.masseyservices.com/wp-content/uploads/2025/11/SPP-418-Image-4.png)
Figure 4. Creating a Block Time from the link at the top of the screen.

1. Complete the required information in the fields:
   1. Description: Include the service type, street address, zip code, customer's last name, phone number, and the initials of the team member who sold the service.
   2. From Date and End Date: These will auto-fill if you use the calendar.
   3. Duration: The default time set by the Scheduler is 60 minutes, but you will adjust it as needed. Refer to our Service Standards for specific guidance.
   4. Time: Enter the service time agreed upon with the customer.
   5. Route: This will auto-fill if you use the calendar.
2. Finally, click Add (or Done if you used the header link).

![](https://milo.masseyservices.com/wp-content/uploads/2025/11/SPP-418-Image-5.png)
Figure 5. Completing the required information in the fields.

**Part 3: Confirmation**

1. A green notification will appear, confirming the block time was created successfully.
2. View the new appointment on the calendar. If you don't see it immediately, click Refresh.

![](https://milo.masseyservices.com/wp-content/uploads/2025/11/SPP-418-Image-6.png)
Figure. 6 The Block Time is shown on the Calendar.

# Downloads

 [SPP 418 Using the Scheduler for Starts, update 10142025](https://milo.masseyservices.com/wp-content/uploads/2025/11/SPP-418-Using-the-Scheduler-for-Starts-update-10142025.pdf)[Download](https://milo.masseyservices.com/wp-content/uploads/2025/11/SPP-418-Using-the-Scheduler-for-Starts-update-10142025.pdf)
